Case Studies
Twice-weekly bulk liquid ink waste for a Chesterfield packaging manufacturer
A high-volume corrugated packaging manufacturer in Chesterfield generates a continuous stream of liquid waste from print press washings and water-based ink residues. If that waste is not cleared on schedule, holding tanks fill up and printing lines risk slowing down or stopping.
We arrange two bulk tanker collections every week, removing around 40,000 litres of liquid ink waste, and pre-book every collection a month ahead so the site team always knows when tankers are due. Loads go directly to a fully permitted treatment plant for specialist physico-chemical processing.
The weekly collections keep tanks within working capacity and production running, with a full audit trail from the site to the treatment facility. Based in Chesterfield, we are on the doorstep for week-to-week coordination.
Monthly solvent waste disposal and Cemfuel recovery
We have worked with this Derbyshire manufacturing client for over 20 years, looking after several waste streams on their site. Solvent volumes change with production, and sending packaged solvents through a transfer station would add handling fees and extra haulage miles.
About seven days before each monthly collection, the client tells us how many IBCs and 205-litre drums are ready. We book a dedicated intake slot at a fully permitted, ISO-accredited secondary liquid fuel blending facility, and arrange for the waste to go straight there. Once the load passes lab checks, the solvents are blended into Cemfuel, a secondary liquid fuel used in cement kilns in place of traditional fossil fuels.
Going direct avoids transfer-station mark-ups and keeps their hazardous storage clear. Every collection is arranged using ADR-compliant vehicles and comes with Hazardous Waste Consignment Notes.